Annex 1. Background, location, design and the restoration process

Author: Pilkington

Publication Date: 2015

Summary: From the final Making Space for Water report

Description:

This report describes the restoration works undertaken during the making space for water project. The restoration process involved grazing exclusion and gully-blocking, followed by stabilisation of the bare peat using heather brash and seeding with amenity grasses, local grasses and dwarf shrubs. This was accompanied by an initial treatment with lime and fertiliser (nitrogen, phosphorus and potassium) followed by two more annual treatments of lime and fertiliser. Finally, plugs of moorland species were planted on scattered locations within the project area.

File Type: report

Project: makingspaceforwater

Keywords: Moorland restoration; lime treatment; heather brash; fertiliser; plug panting; flood management; gully blocking

Download file

Annex 1. Background, location, design and the restoration process ( 3.4 MB)